FeaturesOperation Histories1 RAR with the US 173rd Airborne Brigade
17–20 Dec 1965
Operation Smash
- Days
- 4
- Contacts
- 7
- Friendly killed
- 0
- Friendly wounded
- 2
- Enemy killed
- 2
How it played out
Units
- friendly killed
- larger: more casualties
- how the fighting moved
All 4 days · 7 contacts
Step through the operation with the arrows beside the play button: its first contacts, where the fighting moved, and its most significant contacts, from the record.
The operation
A 4-day operation of 7 recorded contacts. The work was mostly patrols (57%), with 1 RAR most often in contact. No one on the Task Force's side was recorded killed; 2 enemy were recorded killed.
Most significant contacts
On Operation Smash, 12 Platoon, D Company, 1 RAR, made contact with seven Viet Cong and called artillery onto them. Two Viet Cong were killed and two weapons captured.
View in Battle Map
On Operation Smash, A Company, 1 RAR, found a cache of unhusked rice about 800 metres from the battalion harbour. 12 Platoon, D Company, relocated it, and the rice was destroyed.
View in Battle Map
On Operation Smash, A Company, 1 RAR, made contact with an unknown number of enemy and found a Viet Cong camp. Two Claymore mines and some radio parts were destroyed, a transistor radio was captured, and the camp was destroyed. The battalion then harboured for the night on the north bank of the Suoi Ca.
View in Battle Map
On Operation Smash, 4 Platoon, B Company, 1 RAR, on the right flank of a company sweep through a village, was fired on by a single sniper with an M1 carbine while four suspects were being checked. The suspects were secured and the area swept without result. One member of the platoon was wounded.
View in Battle Map
On Operation Smash, 1 RAR was flown from Xuan Loc into its landing zone unopposed, and B Company began sweeping the village to the north. It made contact with a local-force Viet Cong, who fled; one Australian was wounded. Four suspects were detained.
View in Battle Map
On Operation Smash, 8 Platoon, C Company, 1 RAR, made contact with one Viet Cong. The companies closed up on the battalion harbour that evening, and the next day the battalion moved south without contact.
View in Battle Map
Operation Smash (17/65), from 17 to 21 December 1965, was a brigade search-and-destroy operation west of the Courtenay rubber plantation, against a possible Viet Cong concentration area for attacks planned on Xuan Loc, Ham Tan and Baria. 1 RAR, with engineers and New Zealand's 161 Field Battery, was a manoeuvre element of the 173rd Airborne Brigade, moving straight from Operation New Life via Xuan Loc; A and B Companies and part of C Company were flown into their landing zone unopposed.
View in Battle Map